In short
Construction
of Municipal Wastewater Treatment and Collection System in Niš
Lot 1- Construction of WWTP Ciganski Ključ and Wastewater treatment at WTP Mediana
The
overall objective of this project is to protect environment from communal
wastewaters and wastewaters from water treatment plant Mediana by construction
of main collectors and wastewater treatments.
The works
covered under this Project include two components:
• Preliminary Treatment
• Primary Treatment
• Secondary / biological treatment with
nutrient removal in Phase II
• UV disinfection of part of treated
effluent and re-use as technical and firefighting
• Sludge Thickening
• Anaerobic digestion
• Dewatering of stabilized sludge
• Solar drying of dewatered sludge to
50% DS content
The
specific aim of this section is to provide treatment of filter backwash water
and sludge from tube settlers at WTP Mediana and the construction of a process
line for wastewater treatment at the WTP Mediana location, on the left bank of
the river Nišava.
• Treatment of settled sludge and
backwash water
• Design sludge flow – 10 m3/d per
settling tank
• Design sludge flow – 177 m3/d per
filter tank
• Process include chemical dosing,
settlement, sludge thickening and dewatering.
- Sector
-
- Environment
- Components
-
- Design and construction of a fully functional wastewater treatment plant (WWTP) for wastewater generated within the Nis municipality (urban and suburban zone) at the location known as Ciganski Kljuc including the access road linking the WWTP to the local road network.
- Design and construction of a fully functional backwash water treatment plant (BWTP) for sludge generated within the existing water treatment plant at Mediana.
- City / District
- Niš/Nišavski
- EU Contribution
- 38,088,811 €
- Negotiating chapter
-
- 27 - Environment
- Implementation period
- May 2022 - May 2026
- Beneficiary
- Ministry of Environmental Protection